Gerik-Jeli Highway Repairs Nearing as JKR Finalises Assessment
PETALING JAYA – The long-awaited repairs to the Gerik-Jeli stretch of the East-West Highway are on the horizon, as the Department of Public Works (JKR) is in the final stages of assessing the road’s condition. This crucial evaluation will pave the way for much-needed rehabilitation work, addressing concerns about safety and accessibility for commuters.
According to JKR’s Director-General, the assessment process is nearing completion, signifying a positive step towards resolving the ongoing issues with this vital route. The Gerik-Jeli highway has been a source of concern for many years, with deteriorating road surfaces, landslides, and other challenges impacting travel and transport.
Why is the Gerik-Jeli Highway so important?
The East-West Highway, and particularly the Gerik-Jeli section, plays a critical role in connecting communities and facilitating economic activity across Peninsular Malaysia. It serves as a key artery for transporting goods, linking rural areas with urban centres, and enabling travel for residents. The highway’s poor condition, however, has resulted in increased travel times, higher vehicle maintenance costs, and safety risks.
What’s involved in the assessment?
The comprehensive assessment conducted by JKR involves a thorough examination of the highway's structural integrity, identifying areas of damage, and evaluating the underlying causes of deterioration. This includes analysing soil stability, assessing drainage systems, and evaluating the impact of environmental factors such as rainfall and landslides. The findings of this assessment will directly inform the scope and design of the upcoming repair works.
What can we expect after the assessment?
Once the assessment is finalised, JKR is expected to announce a detailed plan for the repair and rehabilitation of the Gerik-Jeli highway. This plan will likely include:
- Road Resurfacing: Addressing potholes and uneven surfaces to improve ride quality and safety.
- Slope Stabilization: Implementing measures to prevent landslides and ensure the long-term stability of the road.
- Drainage Improvements: Upgrading drainage systems to effectively manage rainwater runoff and reduce the risk of flooding.
- Safety Enhancements: Installing or upgrading safety barriers, signage, and road markings.
A Welcome Development for Commuters
The news of JKR nearing the final stages of the assessment is undoubtedly welcome news for commuters, businesses, and residents who rely on the Gerik-Jeli highway. The anticipated repairs promise to significantly improve road safety, reduce travel times, and boost economic activity in the region. JKR’s commitment to addressing the highway's challenges demonstrates a dedication to providing reliable and efficient infrastructure for all Malaysians.
Stay tuned for further updates on the Gerik-Jeli highway repair project as JKR finalises its assessment and announces its detailed plans.